Case Studies

Rockwell Collins (UK) Limited

Complete Connections have assisted RCUK to completely modernise their communications infrastructure. Over 800 data outlets were installed to a central computer room. The outlets were presented in floor boxes attached to a flexible Electrak grid system for the power requirement.

This entire installation was effected in six weeks and Complete Connections project-managed the entire data and voice infrastructure part of the project on RCUK's behalf.

RCUK also took this opportunity to replace all legacy wiring systems (thin ethernet, twinax and conventional voice block wiring) in the original unit.
The entire site now has a leading edge voice and data network.

Complete Connections also re-organised the main Communcations room over the course of one weekend.  The room was completely dissembled all legacy equipment and cabling was removed.  The room was completely transformed as shown in the before and after pictures below.

 
Before
After
 
 
 

Reading Borough Council

Compete Connections have successfully delivered electrical and communications services to many schools and civic offices in the Reading area since January 2001.

We offer a complete support package to the Council in all their departments and successfully implement projects in the varied and often challenging departments and schools throughout the area.

In addition, Complete Connections designed and installed a 600 outlet network within Reading Civic Centre on time and within budget.

 

 
 
 
 

Microgen Limited

During the summer of 2005 Complete Connections have installed a 1000 point Cat 5e system for voice and data and VOIP for Microgen Ltd’s new offices in Fleet.  This installation was carried out within a two week timeframe to enable the customer to meet their installation deadline.  The installation carries our normal lifetime warranty in addition to the excel 25 year warranty from Mayflex.

 

 
 
 
 

Nexagent Limited

Complete Connections also carried out a very complex communications lab installation for this leader edge internet service company.  Again on a very tight time scale 800 cat 5e outlets and 270 fibre optic outlets were installed within the new lab over the course of 4 days.

 
     
 

Email: sales@completeconnections.co.uk

Complete Connections Manufacturing Limited
75 Milford Road, Reading, Berkshire
RG1 8LG

Freephone : 0800 093 4734